banner
Home / Blog / State invests $3.2 Million in Mt. Penn water storage tank and pump station upgrades
Blog

State invests $3.2 Million in Mt. Penn water storage tank and pump station upgrades

Oct 17, 2024Oct 17, 2024

Award-winning home renovation and design store in Leesport and West Reading.

Stadium seating with high-back rocking chairs, IMAX auditorium, concessions.

Mobile notary serving Berks and beyond. Loans, Wills, Power of Attorney & more.

Custom print shop in downtown Reading. T-shirts, hats, gifts and local souvenirs

Berks County based graphic design company with over 25 years of experience.

Award winning and accredited local portrait and fine art photographer.

Our mission is to celebrate diversity in the LGBTQ+ community of Greater Reading

Pay-what-you-can café serving ethically grown coffee and locally sourced foods.

Candy lover's paradise offering gummies, chocolates, ice cream and funnel cake.

Family owned, non-skilled in-home care service. Licensed in Pennsylvania.

Wyomissing digital marketing agency providing a comprehensive suite of services.

Family owned serving fresh food in a rustic atmosphere. 2 locations in Berks.

Bringing talent from around the world to local audiences. Music, dance & theater

Community theater venue featuring house productions of diverse plays & musicals.

Nonprofit dedicated to changing the culture of bullying & unacceptable behavior.

The Shapiro Administration has announced a significant investment in Berks County’s water infrastructure as part of a broader $218.8 million initiative across 21 Pennsylvania counties. This funding, provided through the Pennsylvania Infrastructure Investment Authority (PENNVEST), aims to enhance water quality and safety throughout the Commonwealth by upgrading aging systems, reducing environmental contaminants, and ensuring clean drinking water.

In Berks County, the Mt. Penn Borough Municipal Authority has been awarded a $3.2 million loan to improve local drinking water systems. The project will replace the aging water storage tank on Spook Lane with a modern AWWA D-110 tank, designed to prevent erosion materials from contaminating the water supply. Additional upgrades will include modifications to the Grandview Booster Pump Station and improvements to piping and valves at Friedensburg Road and Spook Lane, ensuring better water flow and reducing the amount of time water is stored in the system.

These upgrades are expected to significantly improve the quality of drinking water for residents by eliminating potential contaminants and optimizing the system’s operational efficiency.

Governor Josh Shapiro emphasized the importance of the project, stating, “Every Pennsylvanian has a constitutional right to clean air and pure water. Our administration is committed to ensuring safe water when families turn on the faucet.”

PENNVEST Chairman Dr. Brian Regli also highlighted the long-term benefits of the infrastructure improvements, adding, “There will never be a more cost-effective time to transform our water and wastewater treatment facilities into self-sustaining energy-makers. Drinking water and wastewater operators planning to incorporate clean energy into their facilities have the ability to benefit from the IRA Tax Credits, while at the same time, utilizing PENNVEST BIL funding for the same project.”

This investment is part of a larger state initiative to revamp Pennsylvania’s water infrastructure, with projects ranging from lead pipe replacement to the integration of clean energy technologies. Berks County’s project is expected to have lasting benefits for both public health and the environment.